Wednesday, October 14, 2009

Loose Boards

1st job is to glue down all of the boards that are lifting. So using strops,wedges and syringe of glue I carefully lifted strip and forced glue in.Covered area with a sheet of plastic and then wedged down using the strop stretched from each side of the boat. 

This will take most of the week as will only get one batch done a day.
Have uncovered more of the fibre glassed repairs and unfortunately some of them are holed completely through the hull.







Looks like a minimum of 20 strips to replace so far